[Please Read] How to Post Hardware Installation Questions
|
|
2
|
1117
|
May 6, 2019
|
Not connected in LB
|
|
5
|
21
|
May 25, 2022
|
Install video from moshi to cohesion3D Laserboard
|
|
2
|
18
|
May 21, 2022
|
Power supply volt
|
|
3
|
19
|
May 19, 2022
|
Hello, does someone use cohesion3D laser board? I need some photos from the back of it. I managed to burn something on mine
|
|
6
|
57
|
May 17, 2022
|
Problems with installing Laserboard in Full Spectrum MLE-40
|
|
7
|
73
|
May 10, 2022
|
Connector pack for Full Spectrum MLE-40 "upgrade"
|
|
4
|
67
|
May 5, 2022
|
Power supply problem
|
|
3
|
42
|
April 24, 2022
|
Memory card
|
|
4
|
61
|
April 19, 2022
|
Cohesion board limits
|
|
4
|
70
|
April 19, 2022
|
Laser always hot
|
|
3
|
64
|
April 7, 2022
|
Dual Y-Axis and Dual Y-Axis limit switch
|
|
3
|
68
|
April 7, 2022
|
Laser fires when I activate Laser On Switch
|
|
2
|
51
|
April 6, 2022
|
2nd GLCD screen not working
|
|
5
|
73
|
March 28, 2022
|
4 Prong Power Wire with 6 Wires? No Laser Fire
|
|
3
|
53
|
March 25, 2022
|
Help with K40 Error Lock
|
|
4
|
80
|
March 18, 2022
|
GLCD always on
|
|
7
|
79
|
March 15, 2022
|
External stepper drivers control output voltage and current range
|
|
5
|
62
|
March 10, 2022
|
New Cohesion board, K40 laser only fires on test switch, not on panel button or through lightburn
|
|
7
|
94
|
March 10, 2022
|
Lightburn camera started glitching during burns then eventually freezes
|
|
6
|
109
|
March 7, 2022
|
LCD won’t work
|
|
2
|
54
|
March 6, 2022
|
A wont slave to Y w/external drivers
|
|
3
|
61
|
March 3, 2022
|
I am about to add a TLC Rotary and have questions
|
|
6
|
81
|
February 21, 2022
|
Can’t get any torque out of light object z table stepper
|
|
7
|
116
|
February 21, 2022
|
Not powering laser, laser stops mid project, now red led, no communication
|
|
15
|
138
|
February 14, 2022
|
Extra wires in power connector
|
|
8
|
121
|
February 6, 2022
|
Ortur lm2 and cohesion
|
|
3
|
74
|
February 4, 2022
|
30mA Current Meter installation
|
|
3
|
117
|
February 4, 2022
|
LCD connection
|
|
9
|
190
|
January 31, 2022
|
Red LED and LB trace outline
|
|
4
|
100
|
January 31, 2022
|